SPEEDBOAT ON A PAGE

Home Docs Guides Ceremonies Templates Setup

Start less. Learn faster. Land more.

Speedboat helps AI-accelerated teams finish meaningful work, not just start more work. Each week, the team limits starts, makes Run visible, and proves what Landed.

Use this page as the cheat sheet. Use Getting Started to start next week, and Full Guide when you want the full rationale, controls, and scaling patterns.


The core question: What meaningful thing are we landing this week?


The model

Preview, Build, and Run are the work lanes. Land is the outcome layer.

PREVIEW: Quick prototypes, PoCs, or demos to learn and enable conversations. Max 3 active. 1–5 day timebox. Decision every Friday: kill, park, continue, or promote. Previews should not drift without a decision. Two types: Discovery (should we build this?) and Demo (make it real for Sales/customers).

BUILD: Production-grade capability work. Max 3 active. Quality bar unchanged. Sources: promoted Previews, committed roadmap, customer needs, platform necessities. Big bets can span multiple weeks, but they should move through meaningful partial Landings rather than one invisible block of Build work.

A WIP item is not a subtask. It is a meaningful unit of work the team is steering: a prototype, a feature slice, a production change, or another outcome-sized piece of work.

RUN: Visible operational work. Split reactive (incidents, escalations) and proactive (debt, upgrades, automation). Aim ≤20%. Track honestly.

Those are the work lanes. Land sits above them as the outcome layer.

LAND: Prove progress. A Landing is a meaningful outcome: something reached a real beneficiary, or new evidence changed what happens next.

Customer Business Platform Decision
Feature live, beta, fix deployed Demo ready, GTM enabled Debt removed, risk reduced Preview killed, parked, or promoted with learning

Record weekly outcomes in the Landing Log.

Team and roles

Speedboat works best with a small boat of about 4-5 engineers.

Product Lead is separate from the crew. Facilitation rotates, but accountability for the health of the boat does not.


A normal week

Three weekly steering points keep the boat moving.

     
Mon Set Course (30 min) What are we landing this week? Confirm WIP. Set ownership.
Wed Course Check (15 min) Still on track? Unblock or adjust scope now.
Fri The Landing (30 min) What landed? Decide every Preview. Capture learning.

Route Planning keeps the next few weeks shapeable.

     
Every 2 weeks Route Planning (60 min) Keep the next 2–4 weeks shaped enough that weekly steering does not become backlog grooming.

Learning Review and Fleet Sync are periodic or adaptive loops.

     
Every 4 weeks Learning Review (30 min) What is the recent work teaching us about the model, WIP, Landing mix, and Run load?

If you run multiple boats, add Fleet Sync every 2 weeks to handle dependencies, shared platform priorities, and cross-boat risks.


Principles

  1. Start less than you could
  2. Make Run visible
  3. Land outcomes, not activity

Two rules

Landing mix — At least some Customer or Business Landings in any 4-week window. Platform-heavy by accident is a signal to course-correct.

Exception protocol — WIP limits can flex for urgent Run or escalations, but the team names what is paused to make room. Urgent Run doesn’t violate Speedboat; hiding it does.


Quick reference

If you’re thinking:

If you’re not sure, it’s probably a Preview.